Precast Application and Production Project
Precast cladding placement is planned in accordance with the architectural project, design and structure; applications compatible with field measurements, detailed application drawings and mold-production sheets are prepared. The production process progresses smoothly by clarifying the carrier system connections, anchor points and production dimensions.