Basın Express, Housing and Life Center

Location

Bagcilar - Istanbul

Date

February 2017 - December 2018

Project Type

Housing and Life Senter

PROJECT SUMMARY

For the project whose design has been completed, quantity calculations and offer study were made. In this living center project, where (GRC) precast application, production and assembly projects were prepared by us, we worked in coordination with the design company, manufacturer and final customer.


SCOPE OF SERVICE

Surveying and application
Preliminary approval project (plan, section, appearance)
Application project
Mold and part production drawings
Assembly project and site-specific details
Technical coordination (production & assembly process)


TECHNICAL PROCESSES

Beginning
The survey of the structure was taken with laser scanning and classical measurement methods. Application drawing for precast (GRC) was created in CAD environment.

Application Project
Application projects were prepared for the entire structure according to the details conveyed in the meetings and approved preliminary drawings. All system details were clarified.

Production Drawings
Part details and production drawings were created in a way that the production team would use. Mold, anchor, carrier system connections were detailed.

Assembly
Field interviews were held with the assembly team. Assembly projects were also prepared by measuring. Sequence, connection, and transportation plans were determined in accordance with the project.

Coordination
Technical coordination was carried out by us by communicating with the production and assembly teams throughout the entire project process.